EXAVY project development
Heat – electricity – synergy
Project development of next-generation network assets
The EXAVY value chain creates a comprehensible structure throughout the entire development process.
Project development at EXAVY follows a well thought-out process. Based on data and analyses, the project idea is fleshed out and loaded with facts. A feasibility study lays the foundation for an energy partnership, for the construction of the energy system and its economic operation. The sustainability and resilience of the operator model is created via the transformation plan, a long-term financing concept and the contracting model.
Your advantage as a project partner: more transparency, more security and success. After all, long-lasting energy networks need to be developed sustainably.
From the project idea to project initiation
The project idea seems viable, now the development project needs to be set up. This includes choosing a project structure, specifying the parties involved, coordinating the stakeholders and clarifying the BEW beneficiaries.
EXAVY coordinates the project initiation phase, establishes a project with all stakeholders and defines the framework for project communication. Initial consultations are held with the municipality and the owners. A project outline is drawn up.
Design project outline and prepare feasibility study
The project participants are now clearly outlined with requirements, roles and interfaces. To underpin the business case, the network must be outlined, energy potential integrated and subsequent project phases modeled.
EXAVY orchestrates the preliminary planning and the collection of all necessary parameters for a transparent construction and transformation plan. The energy requirements and waste heat and generation potentials are sharpened. The schedule for the “feasibility study” phase is generated.
Implement feasibility study and transformation planning
A feasibility study and a transformation plan are used to consolidate the viability of the network idea. An economic feasibility study supports a rough financing plan and the application for funding and the project becomes concrete.
EXAVY coordinates the detailing of the project outline for the business case and ensures that the revenue and cost structure is plausible. With the creation of the transformation plan, GHG savings become transparent. Financing models and funding applications are available.
methodical – resilient – sustainable
Project development service modules
Good project development recognizes viable investment projects, creates transparency and consistently leads them to success. Successful projects are those that identify new network infrastructures through planned action and expertise, put them into operation on time and on budget and secure the business case in the long term.